Cooling Tower Installation Work at Yishun
Our Cooling Tower Project Works at Yishun
Aim of the Project:
The installation of a cooling tower system in a commercial building aims to enhance the building’s heat rejection capability, ensuring efficient temperature regulation and energy conservation within the facility’s HVAC system.
Work Accomplished:
- Installed the pipes, supports & valves according to the design,
- Tested and commissioned with the satisfaction of the client.
Client
Yishun
Date
20th Aug, 2022
Project type
Commercial Building
Our Other Projects
No Results Found
The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.
